Six concreting line items at real 2026 Australian prices, already typed. GST worked out, your ABN checked, every element the ATO requires. Free, nothing uploaded.
Still needed for a valid invoice
Nothing leaves your phone. Your business details are remembered here for next time.
Doing this every week? BackOnTools raises the invoice off the finished job, takes the card payment on the link, and chases the late ones so you do not have to write the awkward text.
Start free for 30 days →Your business name
ABN — — —
TAX INVOICE
#1001
Bill to
Customer
Dates
Issued 18/09/2026
Due 02/10/2026
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Plain reinforced concrete, supplied and laid, per square metre | 1 | $80.00 | $80.00 |
| Exposed aggregate finish, supplied and laid, per square metre | 1 | $100.00 | $100.00 |
| Coloured or stencilled finish, supplied and laid, per square metre | 1 | $100.00 | $100.00 |
| Excavation and site preparation, per square metre | 1 | $25.00 | $25.00 |
| Concrete cutting and removal of existing slab, per square metre | 1 | $60.00 | $60.00 |
| Day rate, per concreter | 1 | $850.00 | $850.00 |
Total price includes GST.
Live preview. This is exactly what prints.
Starting figures, not gospel. Yours depend on your city, your overheads and the job.
ServiceSeeking's concreter guide of 12 February 2026 shows concreters almost never quote hourly: 70% quote per square metre at an average of $92.27, and 10% quote by the day at an average of $848.82, which is $106.10 an hour over eight hours. The hourly band here is that day rate converted, not a separately surveyed hourly figure, so treat the per square metre rate as the real number. The minimum quoted rate on the platform is $10 per square metre, which reflects labour-only pours where the customer supplies the concrete.
| Common concreting line item | Typical price |
|---|---|
| Plain reinforced concrete, supplied and laid, per square metre | $80 to $110 |
| Exposed aggregate finish, supplied and laid, per square metre | $100 to $150 |
| Coloured or stencilled finish, supplied and laid, per square metre | $100 to $140 |
| Excavation and site preparation, per square metre | $25 to $50 |
| Spoil removal, per truck load | At cost plus 10% |
| Concrete cutting and removal of existing slab, per square metre | $60 to $100 |
| Day rate, per concreter | $850 per day |
| Minimum job charge for small pours | $1,500 to $2,000 |
Rates: ServiceSeeking concreter pricing guide, 12 February 2026 (average $92.27 per square metre, minimum $10, average day $848.82 equal to $106.10 an hour, split 70% per square metre and 10% daily). Its concrete driveway and path guide puts the average at $97 per square metre with entry level from $20. The exposed aggregate range of $100 to $150 per square metre supplied and laid is the range Australian concreting cost guides publish for 2026, with Western Sydney quoted higher at $130 to $200; check it against your own supplier and your region. The minimum job charge of $1,500 to $2,000 for very small pours also comes from those guides rather than from platform quote data, so treat it as a starting point. Licensing: QBCC concreting licence and its exclusion of structural concrete, nsw.gov.au $5,000 threshold, Victoria $10,000, WA $20,000. GST: ATO tax invoices. No call-out range is given because concreters do not generally charge one.
Licence and certificates
Concreting is licensed in most states and the licence has a hard ceiling on what it covers. Queensland's QBCC issues a concreting licence over the $3,300 threshold, but it does not cover structural concrete, so house slabs, footings and retaining walls over 1 metre need a builder's licence instead. NSW requires a contractor licence for concreting work over $5,000 including GST in labour and materials. Victoria requires registration as a building practitioner for domestic building work of $10,000 or more. WA sets builder registration at $20,000. Know exactly where your licence stops, because the line between a driveway and a structural slab is the line between a valid job and an unenforceable contract.
GST on concreting work
Concreting is a taxable supply and 10% GST applies to the pour, the labour, the mesh and the pump hire. Concrete delivery, pump hire and cutting subcontractors all invoice you with GST, and you claim those credits, so keep every docket. The delivery docket matters twice over: it is your GST substantiation and it is your proof of the mix strength if a slab is ever questioned. Nothing in concreting is GST-free.
Payment terms that get paid
Concreting takes a deposit, always. The concrete itself is ordered and paid for against your account, and a cancelled or short-ordered load is money gone, so a deposit covering the material order before the truck is booked is standard and reasonable. NSW caps the deposit on residential building work at 10% of the contract price, so on larger jobs stage the payments instead: preparation, pour, finish. Balance on completion, 7 days. On builder work the security of payment rules apply, 20 business days after a payment claim in NSW and a maximum of 25 business days in Queensland.
Quoting without the argument
Quote the thickness, the mesh and the mix strength in writing, because that is where a cheap quote hides. Say 100mm with SL72 mesh on 50mm sand blinding, 25MPa, and a customer comparing quotes can see what they are buying. Then price excavation, spoil removal and access separately, since those are the three that blow out and none of them are visible from the driveway when you quote.
In Queensland, no. The QBCC concreting licence does not extend to structural concrete work, which means house slabs, footings and retaining walls over 1 metre need a builder's licence. That trips people up because the pour looks the same as a driveway. NSW requires a contractor licence for concreting work over $5,000 and the same structural distinction applies through the way the licence classes are written. Check your own licence conditions before you quote a slab, because a contract for work you are not licensed to do is generally unenforceable, meaning you cannot recover payment through a court.
Per square metre for the pour, fixed for everything around it. Seven in ten concreters quote per square metre according to ServiceSeeking's 2026 data, and it is the fairest method for a driveway or a patio because the customer can measure the area. But excavation, spoil removal, formwork on a fall and access charges are not area jobs, so give each its own line. Small pours also need a minimum, because the truck, the pump and the crew cost the same for 8 square metres as for 40. Say the minimum in the quote.
Yes, for at least five years, and file them against the job rather than in a pile. The docket is two things at once. It is your GST substantiation for the credit you claim on the concrete, which the ATO expects you to hold for five years. It is also the only proof of the mix strength and the volume delivered if a slab cracks and someone asks questions two years later. Photograph the docket on site and attach it to the job the same day. It is thirty seconds that has settled a lot of arguments.
Seven things for a sale under $1,000: that the document is intended to be a tax invoice, your identity, your ABN, the date it was issued, a description of the work including quantity and price, the GST amount payable, and which parts of the sale are taxable. At $1,000 or more you also need the buyer's identity or ABN. This tool fills all of them and blocks printing until they are there.
Concreting is licensed in most states and the licence has a hard ceiling on what it covers. Queensland's QBCC issues a concreting licence over the $3,300 threshold, but it does not cover structural concrete, so house slabs, footings and retaining walls over 1 metre need a builder's licence instead. NSW requires a contractor licence for concreting work over $5,000 including GST in labour and materials. Victoria requires registration as a building practitioner for domestic building work of $10,000 or more. WA sets builder registration at $20,000. Know exactly where your licence stops, because the line between a driveway and a structural slab is the line between a valid job and an unenforceable contract. Alongside the invoice you would normally issue: Concrete delivery dockets showing mix design and strength, Engineering certification and slump or cylinder test results on structural work, Reinforcement inspection sign-off before the pour on engineered slabs, Dial Before You Dig plans for any excavation, Council or certifier inspection record where the work required one.
Concreter quote template
Same line items, set up as a quote.
Blank tax invoice
Empty, for any trade.
Charge-out rate calculator
What your hour has to be worth.
Other trades: plumber, electrician, carpenter, painter, roofer, tiler, landscaper, cleaner, air conditioning, plasterer, handyman
The hard part is the four that went out last month and never came back. BackOnTools raises the invoice off the finished job, takes the card payment on the link, and chases the late ones so you do not have to.